News & Events

Maintenance of concrete mixing plan

Maintenance of concrete mixing plan

1. Checking the turning point of the work of the smooth parts smooth and timely supply of oil.

2. Checking smooth inner mixer oil cup oil smooth.

3. Every week to view the lubricator oil level in a timely raise.

4. Opening the valve, the internal air compressor and tank aggregated water discharge every day.

5. Some nuts and bolts should always view is not loose, timely tighten.

6. Water supply, gas, additive systems and the devices are not normal.

7. Reviewing the electrical control system and each instrument is normal.

8. To view of the agitator shaft concrete mixer and simplified cleaning is not clean. If stirred too much concrete shaft cohesion, it is necessary to enter the manual finishing.

9. Ordering and perhaps replace the cement silo dust filter regularly.

10. Hosts regular order residual powder dust inside the pipe to prevent clogging.

11. If the down time exceed more than a week, it is necessary to vent cement, water, additives and a variety of aggregate.

Leave Message

If you have any problems or questions about our products or need our support and assistance, please feel free to write us, we will reply to you within 24 hours, and never reveal your information to the third party. Thank you!

Subscribe to Updates

Subscribe to UNIQUE News and keep up to date with all our activities and events.

Capacity

UNIQUE machines export to Thailand, Philippines, Romania, Dubai, Russia and U.A.E., more than 60 countries.

Contact Us

Add: Construction machinery city, Xingyang Zone, Zhengzhou, Henan, China

FAQ's| Contact Us| Site Map